INDUSTRIAL AND MANUFACTURING

Project Description

   Texas Instruments FAB 1

   2004 Dallas, TX

6,300 tons, chip manufacturing building.

   Genetech CCP2

   2004 Vacaville, CA

6,600 tons, for the manufacture of pharmaceuticals.

   TVA Cumberland Station Power Plant

   1993 Cumberland Station, TN

7,800 tons plus silos.

Absorber and limestone slurry.

   Intel FAB 22

   2002 Chandler, AZ

6,100 tons, chip manufacturing facility.

   Hewlett Packard Genesis IV

   1998 Fort Collins, CO

Chip manufacturing facility.

   General Motors Assembly Plant

   1977 Oklahoma City, OK

Body, chassis, paint and offices.

14,000 tons

   MX Missile Assembly Building

   1967 Fort Worth, TX

110 foot tall assembly structure.

3,000 tons.

   Boeing Manufacturing Facility

   1990 Wichita, KS

Aircraft manufacturing/process.

9,000 tons.

   Generating Station for G.R.D.A.

   1979 Pryor, OK

Turbine room and auxiliary bays.

2,400 tons.

   Kelley-Springfield Plant

   1985 Tyler, TX

Tire manufacturing plant.

4,000 tons.

   Budweiser Brewery Addition

   1988 Fort Collins, CO

Structural steel and tank erection.

2,000 tons.

America's most experienced builder of heavy, complex steel structures for buildings.
Derr Steel Erection Company