| Project | Description |
|
Texas Instruments FAB 1 2004 Dallas, TX |
6,300 tons, chip manufacturing building. |
|
Genetech CCP2 2004 Vacaville, CA |
6,600 tons, for the manufacture of pharmaceuticals. |
|
TVA Cumberland Station Power Plant 1993 Cumberland Station, TN |
7,800 tons plus silos. Absorber and limestone slurry. |
|
Intel FAB 22 2002 Chandler, AZ |
6,100 tons, chip manufacturing facility. |
|
Hewlett Packard Genesis IV 1998 Fort Collins, CO |
Chip manufacturing facility. |
|
General Motors Assembly Plant 1977 Oklahoma City, OK |
Body, chassis, paint and offices. 14,000 tons |
|
MX Missile Assembly Building 1967 Fort Worth, TX |
110 foot tall assembly structure. 3,000 tons. |
|
Boeing Manufacturing Facility 1990 Wichita, KS |
Aircraft manufacturing/process. 9,000 tons. |
|
Generating Station for G.R.D.A. 1979 Pryor, OK |
Turbine room and auxiliary bays. 2,400 tons. |
|
Kelley-Springfield Plant 1985 Tyler, TX |
Tire manufacturing plant. 4,000 tons. |
|
Budweiser Brewery Addition 1988 Fort Collins, CO |
Structural steel and tank erection. 2,000 tons. |